Case Study – Building Client Trust

After connecting through BNI, Andrew was impressed by Richard’s knowledge and hands-on approach to surveying solutions. When faced with two technically challenging projects a few years later, Andrew approached UTSS for their surveying expertise.
The Issue
In Leek, a 17-metre telecommunications training tower required precise foundation planning. It was essential to identify all underground utilities to avoid disrupting services during excavation.
Our Approach
At the training site, we utilised ground-penetrating radar to locate potential underground services, ensuring no gas lines, electrical supply or other critical infrastructure would be damaged during foundation work for the training tower. This approach was essential for both safety and stability of the 17-metre structure intended for telecommunications engineers’ climbing exercises.
The Result
Our comprehensive utility surveying identified all underground services and potential hazards. This ensured foundation excavation could proceed safely while protecting existing infrastructure from accidental damage.
These projects highlight UTSS’s ability to solve visibility and infrastructure challenges with technical expertise, smart equipment, and attention to detail—making us a trusted partner for complex surveying needs.